Rapid Set® TRU Specification
Floor Topping, Floor Resurfacing, Floor Underlayment
SECTION 03 45 16 HYDRAULIC CEMENT UNDERLAYMENT
SECTION 03 35 00 CONCRETE TOPPING
SECTION 03 01 30.61 RESURFACING OF CAST-PLACE-CONCRETE
SECTION 03 01 50.61 RESURFACING OF CAST DECKS AND UNDERLAYMENT
SECTION 03 01 50.71 REHABILITATION Of CAST DECKS AND UNDERLAYMENT
[Note to specifier: Delete unnecessary sections.]
PART I GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the contract, including General and Supplementary Conditions, apply to this section.
1.2 SUMMARY
A. This section specifies material for self-leveling topping, resurfacer, and underlayment that can be used indoor/outdoor, can accept traffic in 2 hours, and can be coated in 12 hours.
1.3 SUBMITTALS
A. Substitutions: [Note to specifier: While this does not belong here, it is shown for your review and inclusion in section 01 25 13.] Requests for substitution must be received by Architect at least 14 days prior to bid opening and shall be accepted only from prime bidders. Request shall include: documentation from an approved independent testing laboratory showing compliance with this specification, record of past performance, list of similar installations, detailed comparison of the qualities of the proposed substitute with the specified product, statement of product costs showing all savings passed to owner if approved, and certification by the contractor that the proposed substitute is in every significant way equal to or better than the specified product.
B. Submit 2 copies of product manufacturer’s literature and Material Safety Data Sheets (MSDS). [Note to specifier: Add any other required submissions.] Visit www.ctscement.com for the latest online version Rev. 090301 PRODUCT SPECIFICATION TRU™ Self Leveling
1.4 QUALITY ASSURANCE
A. References: Comply with the following unless modified by this specification.
1. ASTM C109/C109M-02 Standard Test Method for Compressive Strength of Hydraulic Cement Mortars (Using 2-in. Cube Specimens)
2. ASTM C191-04 Standard Test Method for Time of Setting of Hydraulic Cement by Vicat Needle
3. ASTM C882-99 Standard Test Method for Bond Strength of Epoxy-Resin Systems Used With Concrete By Slant Shear
4. ASTM C928-00 Standard Specification for Packaged, Dry, Rapid-Hardening Cementitious Materials for Concrete Repairs
5. ASTM C1107-99 Standard Specification for Packaged Dry, Hydraulic-Cement Grout (Nonshrink)
1.5DELIVERY, STORAGE, AND HANDLING
A. Delivery: Deliver materials to jobsite in original, unopened, undamaged containers that clearly show the manufacturer’s name, product name, and batch number.
B. Storage: Store material in a dry area off the ground protected from rain, snow, and other sources of moisture. Protect material from temperature extremes.
PART 2 PRODUCTS
2.1 SELF-LEVELING MATERIAL
A. Shall be manufactured by CTS Cement Manufacturing Corp., 11065 Knott Avenue, Suite A, Cypress, CA, 90630. Phone: 800-929-3030 Website: www.ctscement.com
B. Rapid Set® TRU™ Self-Leveling: One component, crack resistant, cement based, self-leveling material for topping, resurfacing, and underlayment that can be used indoor/outdoor, can accept traffic in 2 hours, and can be coated in 12 hours. Visit www.ctscement.com for the latest online version Rev. 090301
PRODUCT SPECIFICATION TRU™ Self Leveling
1. Set time per ASTM C191 (Mod.) at 70F: Initial set 15 minutes. Final set 35 minutes.
2. Compressive strength per ASTM C109 (Mod.): 2 hours 1500 psi 4 hours 3500 psi 24 hours 6500 psi 28 days 7500 psi
3. Slant shear strength per ASTM C882 (Mod.): 1 day 1400 psi 28 days 2600 psi
4. Flexural
5. Tensile
5. Shall meet ASTM C928 for packaged concrete repair materials.
6. Shall be non-metallic with no added chlorides and shall be pre-blended requiring only the additon of water.
C. Rapid Set® Concrete Pharmacy®: Add these small, pre-measured packets to the repair material per manufacturer’s recommendations to change the properties as shown. [Note to specifier: List only the products that you want to be used on your job.]
1. SET Control® — slows down the set time
2. Fast — speeds up the set time
3. Light — lightens the color of the repair material
4. Dark — darkens the color of the repair material
2.2 WATER: POTABLE.
PART
3 EXECUTION
3.1 SURFACE PREPARATION
A. Mechanically remove loose, unsound, contaminated concrete.
B. The aggregate fractured surface shall have a minimum profile of 1/16 inch. Visit www.ctscement.com for the latest online version Rev. 090301 PRODUCT SPECIFICATION TRU™ Self Leveling
C. Concrete must be free of materials such as paint, oil, curing compound, bond breaker, etc. that will inhibit bonding.
D. Thoroughly clean extraneous material such as dirt, loose chips, and dust from concrete surface. If compressed air is used, it shall be free of oil.
E. Apply a good quality primer per manufacturer’s recommendations.
3.2 MIXING
A. Organize personnel and equipment before mixing.
B. Use 5 quarts of water per 50-pound bag of repair material.
C. Mixed material should have a temperature of about 70F. Warmer material will set faster than expected and cooler material will have slower strength gain. Control the mixed temperature by protecting the bags of repair material from temperature extremes and adjust the mixed temperature by using hot or cold water.
D. Add potable water first then add Concrete Pharmacy packets if necessary then add repair material while mixing mechanically in a mortar mixer or with a drill and mixing paddle.
E. Do not add any other admixtures. Do not add sand, aggregate, or cement.
F. Mix for 3 to 5 minutes with a shear type mixer to achieve a uniform, lump-free consistency. Avoid mixers that entrap large amounts or air.
G. Do not re-temper.
3.3 PLACEMENT
A. Pour or pump the material with a minimum thickness of 1/8" and a maximum thickness of 1" onto the prepared and primed substrate.
B. Use a spreader or gauge rake to level the material. Visit www.ctscement.com for the latest online version Rev. 090301 PRODUCT SPECIFICATION TRU™ Self Leveling
C. Use a smoother or other tools to coax the material into place as required.
D. Use a porcupine roller to minimize air bubbles.
E. For thicknesses greater than 1", extend each 50-pound bag of material with 25 pounds of clean 3/8" pea gravel. Place the extended material to ½" below desired floor level and then place neat material for the final ½" within 24 hours.
F. Place material only if surface and ambient temperatures are above 45F and rising.
G. Protect adjacent surfaces with drop cloths, waterproof paper, or other means to maintain them free of material splashes, water, and debris.
H. Place material immediately after mixing. I.Apply sealer, if specified, 12 hours or more after self-leveling material hardens per sealer manufacturer’s recommendations.
3.4 CURING
A. No curing required under normal conditions. However, if used in excessively dry, windy, hot, or sunny conditions, apply water mist to the surface as soon as it can be done without marring the surface and continue until 1 hour after initial set.
3.5CLEAN UP
A. Do not allow buildup of hardened repair material in the mixer, since this creates inefficient mixing and the heat generated accelerates later batches.
B. Clean all tools immediately after use.
C. Clean excess material from surrounding areas immediately.
END OF SECTION
Rapid Set® TRU™ Self Leveling DATASHEETcement repair cement fast setting crack repair
Rapid Set® TRU™ Self Leveling FAQ'scement repair cement fast setting crack repair
Rapid Set® TRU™ Self Leveling SPECIFICATIONScement repair cement fast setting crack repair
Rapid Set® TRU™ Self Leveling MSDS
cement repair cement fast setting crack repair Rapid Set® Acrylic Primer DATASHEET